Carter-Waters - 2020 3M™ VHB™ Structural Glazing Tape Project Initiation Form 1.1

Please fill out all required fields to initiate a project Application Review by 3M and PVD. Note: Customer assumes responsibility for meeting all applicable building codes and requirements.
 

Customer Information

 

 
 
 
If other please specify below:
 
 
 
 
 
 
 
 
(xxx-xxx-xxxx)
 
 
 

Fabrication Information

 

 
Is this project being fabricated in-house at the location listed above? If no, provide the location of application of VHB™ SGT.
 
 
mm/dd/yyyy
 
If different than Customer
 
Note: Actual place of VHB™ SGT bonding
 
Note: Actual place of VHB™ SGT bonding
 
Note: Actual place of VHB™ SGT bonding
 
Note: Actual place of VHB™ SGT bonding
 

Project Information

 

 
As described in Contract Documents
 
 
 
 
 
 
 
 
 

Project Files

Upload Shop Drawings, and other pertinent documents such as specification sections, glazing and finish schedules
 

 
If files are larger than 29 MB, please add link from cloud based storage such as One Drive, Box, Dropbox, etc. in the next field
Drop your files here
 
If files are larger than 29 MB, please add link from cloud based storage such as One Drive, Box, Dropbox, etc. below
 

 

Project-Specific Design Parameters

 

 
Glazed area
 
Number of floors
 
 
 
 
 

Aluminum Framing System and Glazing Infills

 

 
 
List the system type and model
 
Note: At the bonding area
 
Identify type and specification
 
Glass sloping outward requires minimum two sides of support or other forms of positive hold and approval
 
 
 
 
 
 
 
Note: VHB™ SGT develops high bond strength to most ceramic frit coatings. If Opacicoat is used, it requires masking off the bond area of the glass perimeter prior to application without contamination underneath it.
 
List type of panel i.e. ACM or Insulating and description of bonding surface finish
 
 
 
For the entire project: the longest short-edge dimension of infill panel per the aspect ratio e.g. 48" x 96" = 48" or 60" x 48" = 48"
 
Largest single piece of glass or panel with the greatest area
 
 

VHB™ Structural Glazing Tape

 

 
 
Note: Specific to system application. Not suitable for widths less than 5/8" without advanced 3M™ approval
 
Estimated lineal footage of the entire project for systems that use VHB™ SGT
 

It may take up to 5 business days for Application Review to be complete

Once the Application Review is complete tape can be ordered from your 3M™ VHB™ Tapes Select Distributor.