Campus Power Outage Continuity Survey
The Utilities and Energy department will conduct maintenance on feeder breakers that will require short duration power outages on Monday, June 1 and Tuesday, June 2. Most buildings on campus will experience brief duration power outages lasting approximately 10 minutes plus building restoration time. This utility maintenance is mandatory and critical for the continued safe operation of the campus electrical system. On Monday, the feeder shutdowns and planned outages will start at 8:00am and buildings will experience a brief outage at a scheduled time based on building feeder. On Tuesday, the entire campus will move from EWEB power onto full campus power temporarily to test the backup generator system at the Central Power Station at 8:00am. During the testing, the power to campus may be lost if a portion of the system does not perform as expected. CPFM has launched a webpage with additional information regarding these planned outages. To learn more follow this link: https://cpfm.uoregon.edu/spring-break-2020-power-outage-information-0. Safety & Risk Services is collecting information about potential impacts for continuity planning. This would include assistance with powering computers back up that are using remote desktop functions. Please take a few minutes to respond to this survey.