On-Site Resistance Test Results
Stage 1 Reading: Take the first reading prior to installing your CosyFloor system.
Stage 2 Reading: Take the second reading after the CosyFloor system is laid, but prior to flooring installation.
Stage 3 Reading: Take the third and final reading after the final floor covering is laid.