SEWAGE PUMPING STATION REQUEST FOR PROPOSAL

Simply enter the fields below and submit this form for Q-Max to quickly respond with a Budget Cost Proposal.

We may already know you but please enter your name anyway


PROJECT DETAILS

This helps us easily reference the information in further communications

Role in this project:

If the location is not in a town, just enter the nearest town name. This assists us to provide selections and data that is relevant to the particular location.

Project State:

i.e. Local Shire or Council / Water Authority applicable to this project


CATCHMENT / FLOW CALCULATION

Preferred Calculation Method:
Development Type:

Gross Hectares of the proposed development. A Hectare is an area 100m x 100m (yes, sometimes it does help to clarify this!)

Enter the Number of EP for the proposed development if it is already determined. Otherwise check "Not Sure" below

Only enter this if you checked "Not sure" above

Average Recurrence Interval (ARI) for sewage overflow frequency.

2 years
Caret IconCaret symbol
Emergency Storage Required?

Commercial / Industrial:

COMMERCIAL / INDUSTRIAL ONLY. Enter this as a percentage of the gross plan area likely to be covered by impervious structures that drain directly to the stormwater system. Otherwise leave blank and we will nominate a default estimated percentage in our response for your review.


PUMP WELL DETAILS

Pump Station Diameter & Construction

Please tell us more if you checked "Other" above

Pump Station Depth:

Enter RL references for top of top slab and floor of pump well or else overall depth in metres (if known)

If known, please advise depth from surface to gravity invert, otherwise we will make an assumption of approx 2.5m

Access Covers:
Valve Chamber:
Preferred Internal Pipework:
Venting
Knifegate Valve:

On incoming Sewer line, inside Pump Well


PUMPING REQUIREMENTS

Pumps:

Preferred Brand

If you entered RL's at Pump Station depth enter RL of discharge point. Otherwise enter Static head in Metres from Pump Station top slab to Discharge point.

Rising Main Preferred Material:

We will provide a RM size for your consideration, based on flow, friction and material you select


CONTROLS

Switchboard / Controller:

(If you checked second option to above question) Or feel free to upload any other relevant drawings or information.

Drag and drop files here or
Level Controls:

OTHER OPTIONS

Flow Meter:
Epoxy Coating:
Emergency Pump Out Tee:

GENERAL

Feel free to let us know anything else that may be relevant to your project or list any queries you would like additional information on. We're looking forward to working with you!