Select
Caret IconCaret symbol

Please select if communication regarding this project should be sent to distributor, contractor or both.

Select
Caret IconCaret symbol

If customer not listed, please select "New Account".

If contractor not defined yet, please select "TBD".

Select
Caret IconCaret symbol

Add customer name if not in the list above

Provide e-mail for main contact for the project.

Additional e-mails can be added in the comment section.

Please provide the phone number for follow up on the quote/estimate

Phone

If not listed, please note it on the comment section below

Select
Caret IconCaret symbol

Please provide e-mail for the distributor contact, if different from project contact


We will try to accommodate this date, but our team will reach out with a revised submittal date as soon as possible. Below are typical lead times.

  • For Lift & Brace estimates please allow 3-4 working days
  • For Insulation or Complete Tilt estimates please allow 5-6 working days
  • For Shops please allow 2-3 weeks
  • For engineering please allow 2-3 weeks

If you need this sooner, please note in the comments and we will work with you to meet your deadline.

Request Type*

Please select if you just require an estimate (engineering will not start until approved) or you would like for design to start as soon as possible (charges may incur)


If you are awarding the job to initiate design, please select design and then you will have an option to request an estimate as well

Quote/Estimate Type*

Important Notice for Engineering

You are requesting engineering services that may have charges associated. By submitting this form you acknowledge that Leviat is released to start design as soon as possible.

Important Notice for Quote/Estimate

You are requesting a quote or estimate request for engineering services or material take-off. By submitting this form you acknowledge that Leviat is not released to start design and will not start design services until proper notification clearing us to initiate the work.


Note for Insulated Tilt-Up Projects: If both "Tilt-Up Lift & Brace" and "Insulation" Service Types are requested, a "Complete Tilt" Quote/Estimate will be provided.

Select all the services being requested.


Note: Shop Drawings are "Forming and Embed" drawings and do NOT include lift and brace inserts.


Choose below all additional services that you will require outside of normal engineering for Lift and Brace or Thermomass. Please note that additional charges may be incurred for each.

Important Notice for Shop Drawings

Shop Drawings are forming and embed drawings and do NOT include lift and brace inserts. Please make sure to only select shop drawings if this is the service requested, or charges may be incurred. Contact projectengineering@leviat.us if you have any questions.


Check the box if a quote or estimate is also required in addition to engineering. NOTE: Engineering will start as soon as possible and charges may be incurred.

Select all the services requested

Let us know your email address.

Provide any additional information relevant to this project.


If known, please indicate the number of separate buildings for the project.


IMPORTANT - if you have a link to the job drawings, please paste it here.


You can also upload files and e-mails on the next page after pressing submit.