Labor Quote Request Form
Smartsheets often returns an error if you add the attachments before filling out the form. ADD ATTACHMENTS LAST.
Who is submitting this request?
Who is the SSS?
Client/Account Name
Project Specific Name
Do not input "N/A" in this field. Use a " / " to separate multiple SO#s.
At a minimum, the due date for the labor quote should be the day prior to the due date to the client.
All information and drawings and/or scope of work must be submitted. The due date should be used to convey urgency. Please be realistic so the PM Team can properly prioritize everyone's requests. (try to give us 48 hours for in-market quotes, 72 hours for out-of-market quotes)
Check here if the PM Team needs to make you a customer-facing schedule.
Extra tasks to include in the schedule? Other details? Please share.
Enter the estimated OE date for the schedule
Enter the estimated FDOB date for the schedule
Final Labor Quotes require a BOM with Extended List price included. (Some exceptions do apply)
A BOM is required for a final labor quote.
Which of these would you like the 3rd party to include in their quote? (Initial Scope is Required).
If you want phasing, please fill out the "Additional Labor Trips Needed" field.
This is required for 3rd party installations to confirm install availability
Please fill out the location of your Outbound Intermarket.
Select yes if pricing will be run through a GSA Contract (For San Antonio markets only)
Is the client a General Contractor, instead of the end user?
Will our install teams be required to attend safety/orientation meetings during install?
You must provide full electrician scope here. Bidding electricians will use this to send an estimate
A site address or location helps determine accurate travel time hours.
If you have detailed plans, BOM, and/or visual, a detailed written scope is not required; however, if the attachments do not accurately describe the scope, please help us and write out the scope as you know it to be.
Check if "Yes"
Review the PM Requirements - does this project fall under the requirements to have a PM involved? If yes, this labor quote is to add the PM cost, not to assign a PM (submit PM Request at time of award)
We will use this field to adjust our PM Cost (more for a client who you know will need extra attention, extra on-call demand, through the course of the project)
Zero stars is a normal project - Increase the star level based on the needs of your client
Will the project include OAC meetings?
Describe # of OAC mtgs, special requests of the PM, other relevant notes...
Please select any site condition(s) that apply. If a site condition is not listed, please add in the Comments section. You may select more than one site condition.
Standard Site Conditions are as follows: Loading Dock, Freight Elevator, No Stair Carry, No Street Offload, No Building Protection Needed, Less than 50 yard push path from delivery location to install location, No Badging/Security Check In required, Sufficient Staging Area at Delivery location
Attach any necessary drawings, photos, or product presentations to help with quoting. Please make sure to include a Bill of Materials.