Request for Pre/Post Building Submission Conference

Phone
  1. Items discussed during the meeting do not constitute a plan review or approval; the plans will be reviewed for compliance when submitted.
  2. Pre/post submission meetings are limited to one hour in duration.
  3. The design team shall be responsible for taking meeting minutes. The meeting minutes shall be sent to the county for acceptance or comment within five business days of the meeting.
  4. Any items not resolved during the meeting may be followed up in the meeting minutes or by email.
  5. I have read Fairfax County Office of the Fire Marshal (OFM) Commercial Plan Review Submittal Requirements.
  6. Meeting minutes accepted by county staffs have to be incorporated on the permit set drawing and submitted while applying for building permit.

Required Items (4): Meeting Agenda, Drawings, Attendance Form, Meeting Worksheet


Notes: 1. Meeting will only be scheduled upon acceptance of the required items 2. Drawings: life safety, code analysis, floor plans, etc. 3. If total file size exceeds 30MB upload limit, please include a download link in the project description.

Drag and drop files here or